Bedside Table Square Side Table, 4 Legs Bedside Table, 21 Inch End Table Load Bearing 25Kg for Sofa Coffee Laptop Living Room Bedroom Nightstand (Color : Beige)

In stock
SKU
B09K7M5WBS
$16.58

Product Quick Look

  • Product DescriptionProduct name: square side table; simple bedside table; 4-leg coffee tableProduct size: 55*55*45cm (21.6*21.6*17.7 in)Product color: white, beigeMaximum load-bearing capacity of the side table: about 25kgProduct material: particleboard; fiberboardAssembly: simple assembly requiredNo drawer design: easy to take and store itemsCleaning: Wipe clean with a damp cloth. Wipe dry with a clean cloth.You can set up side tables like that: store books, desk lamps, alarm clocks, vases, etc.Multi-purpose: as a small desk; as a bedside table; as a tea table, etc.Create your small space: display your favorite things, such as a beautiful bowl, a piece of coral, a special small decoration or a tray, you can create a space of your own.Please pay attention to the following information:1. We only sell side tables, other items are just photography props and are not included in the merchandise.2. The product pictures are all real pictures, but due to factors such as the shooting technology, light, display parameters, etc.,The color of the actual product received may be different from the picture, please refer to the actual product.3. Due to the different measurement tools and methods, there will be an error value (1-3cm) in the size of the furniture product, which belongs to the normal range, and the actual product shall prevail.4. Wish you a happy life!
  • Side table or end table, this kind of flexible furniture not only provides space for the family to place things, but also enhances the texture of the space.
  • The square sofa table is a convenient little table! It is very suitable for holding snacks and drinks while watching TV, or placing remote controls, mobile phones, tablets, magazines, etc. in the living room, bedroom or bathroom.
  • Enjoy a touch of luxury in your home. Modern and simple style solid color series side table. No matter where you use it, it can create a chic and elegant environment. Design for life!
  • This side table has a non-marking foot-slip design to protect the floor from abrasion, creasing and other potential damage.
  • Easy to assemble: It only takes 15 minutes to assemble the table in 3 simple steps: assemble the legs, install the table top, and then turn the completed table over; total size: 21.6" (diameter) x 17.7" (height) ).
Item Weight ‎0.035 ounces
Date First Available October 25, 2021