Viewing a single comment thread. View all comments

daybeers t1_ixmjnph wrote

SLE was electrified using Metro-North M8s this past May. Still needs improvements, though. Track 6 in New London still isn't wired even though that was on tap to be done this year.

3

Prestigious_Bobcat29 t1_ixmjuj6 wrote

Yes track 6 is what I was referring too, not the rolling stock, sorry

2

daybeers t1_ixmk86r wrote

Ya there's still one run each direction on weekdays that's bustituted.

The I-95 expansion is bullshit; I hope residents stand up for that because they already destroyed enough wetlands when it was originally built.

Do you work for the DOT/a COG or in the private sector?

2

Prestigious_Bobcat29 t1_ixmldj7 wrote

A cog, thankfully not working directly on the 95 study so I’m free to engage with it on a personal level

2