Viewing a single comment thread. View all comments

LittleBigSeed t1_j9z6glc wrote

I don't know a lot, but based on my understanding, the costs might equal out. If we are not having to pay to source new materials that would lower the cost of building. the cost goes back up again when you now factor in the extra labour costs. So, perhaps the cost won't change overall, but I think the environmental impact would be a double positive.

2

Surur t1_j9znmoc wrote

Given that Labour is much shorter than material at present I think that is introducing a major cost and bottleneck.

1