Viewing a single comment thread. View all comments

merouane_nz t1_iu3ioj4 wrote

- It takes a lot of time. (model selection x HPO x test/validation)

- The most important part of a data project is data preparation/feature engineering, modeling is somehow the simplest part.

- IMO it takes much longer to use a visual interface than scripting.

3