RKO36 t1_j93haf4 wrote
They're not replacing it, I don't believe. They're making repairs here and there from my understanding. It isn't closed all the time. I think just from 11-3 some days (Thursday only?)
Nexis4Jersey t1_j93lai7 wrote
Its being replaced , I believe the Passaic River NJT Bridge and the Bridge Street Bridge are next followed by the DOCK and FRB Bridge which will be rehabbed.
1Pichi t1_j93hpas wrote
GhostOfRobertTreat t1_j93sfe7 wrote
Hope they’re taking into account a connection for the future riverfront walkway when they build it….
ScrollHectic t1_j9kr19l wrote
Hopefully it also looks good. A bridge doesn't have to be utilitarian.
1Pichi t1_j93h11d wrote
They’re going to replace it