Viewing a single comment thread. View all comments

courageous_liquid t1_j5fl2hb wrote

> A look at the 104 bus shows that septa service to West Chester isn't particularly busy once you go past 476 on West Chester Pike.

Because it blows. From my house in south philly it would take me 2 hours to get to west chester via the 104. It's easier to just get a zipcar and deal with 95/476 or the schuylkill/202 or take the regional rail and picked up at wawa.

I'd love the west chester line as it's one of the major places in the philly burbs where there's just no good way to get to. I realize there are significant setbacks and it'll be a decade before it runs again even if the political stuff gets ironed out quickly, but judging by the traffic I've seen getting off at wawa, it might have some legs. Before wawa opened, that line would have like 3-4 people still on the train getting off at elwyn off-peak, the last train I took out there on the weekend, both cars were about half full and getting off at wawa.

6

blue5801 t1_j5fmbas wrote

The problem with Elwyn is that it's in the middle of nowhere on the school grounds. Media probably got the most passengers on the line (those who don't want to take the trolley or 110 bus from 69th st).

Unfortunately past Wawa before Glen Mills, a lot of the line has issues. I believe there's several bridges that are falling apart which are the biggest projects and would cost the most to replace.

I'm not saying the service isn't there, but if they were to merge Cheyney into West Chester university and use it as an overflow school and them picking up some of the fare costs, for students, it might make Septa want to increase train service to West Chester. Until that time, increased service to Exton is probably going to be the best bet.

2

courageous_liquid t1_j5fnzei wrote

Even media is basically dead outbound off-peak, in my experience. Surprisingly (or unsurprisingly) swarthmore seems like it's the stop on the line with the most traffic off-peak.

Elwyn is crazy busy on-peak, people park dangerously on the street and you can't get a spot unless you're there by like 7am in the morning. It's a huge collector for that side of delco.

But yes, the infrastructure issues are a huge hurdle, which is why I don't actually see anything practical happening in the next decade, even if that other agency that wants to buy the trainset gets fully funded.

2