Nope nope nope. Those contractors get you on the hook and basically put you on a backlog since they have so many jobs going on. Not quality work, quantity for them.
Assuming you don’t have to move any plumbing, it shouldn’t be 15K. It would be whatever the cost of the bathtub is, plus labor. Say 6 hrs labor tops at $150/hr tops.
lesbrarians OP t1_itev6pz wrote
Yeahh, that was the impression I was starting to get after the dude gave me his hour long spiel, it was some real skeevy vibes — glad to know my gut instinct was correct. Thank you for the numbers, that gives me a much better perspective as to what I should be anticipating