Sounds like a super-salesperson made a good presentation.

Hey, I wrote that without even using the word 'bribery'. 8-)

8

AgencyDelicious1933 t1_j82w2ha wrote

Well, at least the project was still in the "design phase" and the "only" set back is the release date pushed to 2026 💀

3

Hugh-Dingus t1_j8369ea wrote

Ask the Netherlands NS, same kind of fuck up… it apparently happens…

2

Fairytam2 t1_j83ogel wrote

Well South Africa bought trains that don't fit the tracks ...

3

ash_274 t1_j849pt9 wrote

[Spain also had submarines that were too large to dock at their submarine base (since modified to fit them).

The original design would have fit, but they designed them too heavy to reliably stay or or come back to the surface, so the boats had to be enlarged to solve that problem.](https://www.bbc.com/news/world-europe-44871788)

2

ash_274 t1_j849r42 wrote

[Spain also had submarines that were too large to dock at their submarine base (since modified to fit them).

The original design would have fit, but they designed them too heavy to reliably stay or or come back to the surface, so the boats had to be enlarged to solve that problem.](https://www.bbc.com/news/world-europe-44871788)

0

BirdsbirdsBURDS t1_j84cmno wrote

The likely answer is somebody took a budget, took some basic measurements of “train in Spain” and didn’t do the follow up on questions like “what’s the max dimensions” before putting in orders for hardware to a place like Japan or china. The trains are probably really good, but exceed max limits because numskulls would rather lock in contracts without ensuring that they are contracting for goods/services they can actually use, and that meet their requirements. Investors are gonna be pissed, because now more money is gonna be needed and more time to get returns because someone somewhere didn’t do their jobs right.

2

JeepWranglerSport t1_j856dvn wrote

It’s like a real short girl dating a really really tall big muscular guy. She should consider that a certain part might not fit or she might get broken in half.

1

SomebodyInNevada t1_j86wca8 wrote

It doesn't give details--was this a case of the train "fits" but doesn't have the required clearance for turns and the like?