Submitted by ScottishCalvin t3_z90gz5 in philadelphia
NotSureNotRobot t1_iyentit wrote
Reply to comment by Dryheavemorning in Washington Ave new surface - Already being dug up by ScottishCalvin
It’s just one of those built-in bullshit ways of getting these things done. There’s no way that all of the utilities can be hooked up/maintained on the repaving schedule across an entire block let alone the city.
AdministrationNo9238 t1_iyfdomm wrote
Homeowners are responsible from the main to their faucet. Your approach would require homeowners finances to ask sync up with the repair schedule.
jorge1209 t1_iyf9c47 wrote
If the utility was required to do a better job patching they might do a better job coordinating work.
Viewing a single comment thread. View all comments