WoodwickVonRazzle t1_j0us7yx wrote
Reply to comment by Vapid_Ingenue in Facebook parent Meta adding to Henrico footprint with code-named ‘Project Tropical’ data center - Richmond BizSense by Charlesinrichmond
Hopefully this means my power never goes out for long 🤞🏼
I wonder if they have plans for tropical to make sure any water runoff is controlled, that dip in the road down there floods frequently and would be hellish frozen
Vapid_Ingenue t1_j0utbz1 wrote
The engineers have detailed plans to preserve the wetlands. They've been working on that behind RVA 5/6 for maybe six months now. With the busses running along that route all day long I'm sure they're going to control runoff 👍
I can't assure your house won't be out of power for long, but the generators cost about $1.5M a day to run, so I'm guessing it will be a priority to restore power as quickly as possible