Submitted by AmethystOrator t3_zxei84 in worldnews
[deleted] t1_j22bcbo wrote
Reply to comment by AmethystOrator in Finland gets floating LNG terminal to replace Russian gas by AmethystOrator
[deleted]
AmethystOrator OP t1_j22bndq wrote
> is scheduled to be operational from the beginning of 2023.
HouseOfSteak t1_j22sc5v wrote
So 3 days?
RSCiscoRouter t1_j230zsv wrote
Its not really... produced. Its a ship
JackfruitComplex8856 t1_j23up9d wrote
He meant operation, I suppose, though the two terms are often used somewhat interchangeably by industries.
asdf9asdf9 t1_j23482t wrote
Beginning = First quarter of the year
karaps t1_j240omp wrote
Pretty much, the contract was signed half a year ago and they've spent the time since both constructing the shore connection and some modifications to the ship itself so it can handle better the northern climate.
It's also carrying its first gas cargo load with it so it should be able to start feeding gas into the network pretty fast.
Viewing a single comment thread. View all comments